Powered byNHTSA|EPA|Community Reports|Updated
HomeTSBsThomas Built Buses2000 Saf-T-Liner C2

2000 Thomas Built Buses Saf-T-Liner C2 TSBs

5 Technical Service Bulletins across 4 categories

Engine

2 bulletins
10193649

Thomas Built Buses Product Awareness Bulletin on Allison 2550 PTS w/ Detroit Engine (DD5)

10032686

THOMAS BUILT: RESERVOIR INTERNAL/EXTERNAL CHECK VALVE.

Read full bulletin

CONTAMINATION IN THE WET/SECONDARY RESERVOIR, P/N 12-15476-00, MAY CAUSE THE INLINE CHECK VALVE TO BECOME CLOGGED OR STUCK CLOSED. THIS CAN RESULT IN INSUFFICIENT AIR BUILDUP. NO MODEL YEARS LISTED. *PE

Suspension

1 bulletin
10039618

FREIGHTLINER: THE INSTRUCTIONS TO LUBRICATE THE WHEEL BEARINGS ON A REAR DRIVE AXLE.

Read full bulletin

*RM

Fuel System

1 bulletin
10032678

THOMAS BUILT: OCCASIONALLY THE AMBER DIESEL PARTICULATE FILTER (DPF) STATUS LIGHT ON THE DRIVER MESSAGE CENTER MAY COME...

Read full bulletin

ON, INDICATING THAT THE EXHAUST SOOT LEVEL IS ELEVATED. SAF-T-LINER CS MODEL. NO MODEL YEARS LISTED. *PE

Other

1 bulletin
10028711

THOMAS BUILT: NEW TIGHTENING PROCEDURE HAS BEEN DEVELOPED FOR HALF ROUND U JOINT BEARING STRAP CAPSCREWS, WHICH SHOULD EXTEND U JOINT LIFE.

Read full bulletin

MODEL YEARS UNKNOWN. *PE