2002 Safari Coach Sahara TSBs
2 Technical Service Bulletins across 2 categories
Categories
Pre-Delivery & Maintenance
1 bulletin10005615
DURING THE FACTORY INSPECTION PROCESS, IT WAS DETERMINED THAT SOME UNITS COULD POSSIBLY HAVE THEIR LP LINES TOO CLOSE TO THE SLIDE-OUT HARDWARE.
Read full bulletin
AS A PRECAUTION, MONACO COACH IS RECOMMENDING THE LOWERING OF THE LP TANKS TO REDUCE THE CHANGE OF THE SLIDE-OUT HARDWARE RUBBING ON THE LP LINE. *TT
Other
1 bulletin10003083
JB RADIATOR INNER COOLER FAILURE ON ALUMINUM RADIATORS.
Read full bulletin
*TT