2006 Prevost X3-45 TSBs
28 Technical Service Bulletins across 14 categories
Categories
Steering
4 bulletinsSTEERING GATEWAY. Revision B - PIN 2 and 10 were inverted on connector A139
TIE ROD 610052 FIRST INSTALLATION INSTRUCTIONS: Use these instructions when replacing the drop joint tie rod on S82, S84 / S84U I-beam axles.
Read full bulletin
The new tie rod will be adjusted to the length of the original; however, a steering alignment needs to be performed after replacement.
Vehicles identified below are compatible with a new tie rod design.
Read full bulletin
This new tie rod 610052 has updated ball joints and a fine adjuster sleeve. It replaces former drop type ball joint tie rods. Refer to IS-18091 for installation instructions. This document details maintenance inspection and toe-in adjustment with the new design tie rod.
POWER STEERING PUMP DISCHARGE HOSE (PRESSURE) REPLACEMENT
Other
4 bulletinsAir Tanks Draining Sequence.
Read full bulletin
Revision: A - Erroneous Secondary & Accessory tanks location.
Air Tanks Draining Sequence
PREVOST VEHICLE DISINFECTION PROCEDURE
HAND SANITIZER DISPENSER INSTALLATION
Pre-Delivery & Maintenance
3 bulletinsSTORAGE AND STARTUP GUIDELINES: Periodically, circumstances arise requiring operators to temporarily park a coach in storage.
Read full bulletin
Whether it is a few weeks or several months, sporadic out of service times or a full stop, Prevost recommends following the guidelines in this document during times when: The coach can be operated on a regular/weekly basis while in storage. The coach will be in storage for an extended period without any operation. The coach will return to service following an extended period of downtime.
STORAGE AND STARTUP GUIDELINES Revision: B Parts added to Suggested Material 08-10-2020
STORAGE AND STARTUP GUIDELINES - ALL PREVOST VEHICLES & VOLVO 9700
Electrical
3 bulletinsAdded: Power cables for L.H.
Read full bulletin
side alternator & fan drive breaker box
Revision : Addition of Wiring Schematics at the end of this document
The intent of this procedure is to guide you through the steps required to program a MCM especially for the control of...
Read full bulletin
the HVAC module as described in instruction sheets IS-19923.
Suspension
2 bulletinsSway bar collars improvement.
Read full bulletin
Revision A : Add front sway bar support replacement and change bolts lenght.
SWAY BAR COLLARS IMPROVEMENT
HVAC & Climate
2 bulletinsCENTRAL HVAC MERV FILTERS INSTALLATION
CENTRAL HVAC MERV FILTERS INSTALLATION REVA
Engine
2 bulletinsRev A: Mention added concerning DDC Series 60 engine SCA requirement
INTRODUCING A NEW ENGINE COOLANT INTO SERVICE
Transmission
2 bulletinsFAN CLUTCH PLATE BOLTS RE-TORQUING
JERKY, NOISY OR HARD TO TURN STEERING GEARBOX.
Read full bulletin
HYDRAULIC END LIMITER ADJUSTMENT. All models equipped with RB Bosch/ZF Servocom or Servocomtronic steering gearbox
Software & Calibration
1 bulletinAir Tanks Draining Sequence.
Read full bulletin
Revision: B - General Update
Lighting
1 bulletinHalogen to LED fog light replacement kit.
Read full bulletin
Revision: C - Advanced kits canceled
Hybrid & EV
1 bulletinSTORAGE AND STARTUP GUIDELINES: Rev A: 21516229 replaced by 23381562 20523393 replaced by 21454749 800383 removed ...
Read full bulletin
611471 replaced by 611360 70376808 replaced by 21036050 21396642 replaced by 20967831
Body & Paint
1 bulletinThis instruction sheet explains how to install 780428 door actuator replacement.
Infotainment
1 bulletinMP-1000 MULTIMEDIA PLAYER INSTALLATION
Air Bags & Safety
1 bulletinPREVOST: INSTALLING THREE-POINT PASSENGER SEAT RESTRAINT SYSTEM.
Read full bulletin
THE PURPOSE OF THE FOLLOWING PROCEDURE IS TO FACILITATE THE JOB AND TO HELP IDENTIFY THE DIFFICULT AREAS. ALSO INCLUDED MODELS HE-41 AND HE-45 COACHES MODEL YEARS 1998-2008; MODEL XLII AND X3-45 COACHES MODEL YEARS 1998-2008. *JS