2008 Prevost X3-45 Vip TSBs
28 Technical Service Bulletins across 12 categories
Categories
Engine
6 bulletinsKIT POWER STEERING TANK CONVERTION CUMMINS TO ZF WITH D13 ENGINE
Improved bearings are now available to replace the original bearings used on some Prevost vehicles idler pulleys.
INTRODUCING A NEW ENGINE COOLANT INTO PREVOST SERVICE CENTER NETWORK
Rev A: Mention added concerning DDC Series 60 engine SCA requirement
INTRODUCING A NEW ENGINE COOLANT INTO SERVICE
Explains that improved bearings are now available to replace the original bearings used on some Prevost vehicles idler...
Read full bulletin
pulleys.
Other
4 bulletinsThe gasket thickness was increased from 1.5 mm to 3 mm to prevent interference between the collar ends, which previously...
Read full bulletin
made it impossible to reach the specified tightening torque. Increasing the gasket thickness ensures sufficient clearance between the collar ends and thus guarantees optimal tightening.
Air Tanks Draining Sequence.
Read full bulletin
Revision: A - Erroneous Secondary & Accessory tanks location.
Air Tanks Draining Sequence
PREVOST VEHICLE DISINFECTION PROCEDURE
Pre-Delivery & Maintenance
3 bulletinsSTORAGE AND STARTUP GUIDELINES: Periodically, circumstances arise requiring operators to temporarily park a coach in storage.
Read full bulletin
Whether it is a few weeks or several months, sporadic out of service times or a full stop, Prevost recommends following the guidelines in this document during times when: The coach can be operated on a regular/weekly basis while in storage. The coach will be in storage for an extended period without any operation. The coach will return to service following an extended period of downtime.
STORAGE AND STARTUP GUIDELINES Revision: B Parts added to Suggested Material 08-10-2020
STORAGE AND STARTUP GUIDELINES - ALL PREVOST VEHICLES & VOLVO 9700
Suspension
2 bulletinsSway bar collars improvement.
Read full bulletin
Revision A : Add front sway bar support replacement and change bolts lenght.
SWAY BAR COLLARS IMPROVEMENT
Steering
2 bulletinsSTEERING GATEWAY. Revision B - PIN 2 and 10 were inverted on connector A139
POWER STEERING PUMP DISCHARGE HOSE (PRESSURE) REPLACEMENT
Software & Calibration
2 bulletinsAir Tanks Draining Sequence.
Read full bulletin
Revision: B - General Update
STORAGE AND STARTUP GUIDELINES : part number updates
Lighting
2 bulletinsHalogen to LED fog light replacement kit.
Read full bulletin
Revision: C - Advanced kits canceled
THIS INSTRUCTION SHEET EXPLAINS HOW TO REPLACE HALOGEN FOG LIGHT TO LED'S
HVAC & Climate
2 bulletinsCENTRAL HVAC MERV FILTERS INSTALLATION
CENTRAL HVAC MERV FILTERS INSTALLATION REVA
Transmission
2 bulletinsFAN CLUTCH PLATE BOLTS RE-TORQUING
JERKY, NOISY OR HARD TO TURN STEERING GEARBOX.
Read full bulletin
HYDRAULIC END LIMITER ADJUSTMENT. All models equipped with RB Bosch/ZF Servocom or Servocomtronic steering gearbox
Hybrid & EV
1 bulletinSTORAGE AND STARTUP GUIDELINES: Rev A: 21516229 replaced by 23381562 20523393 replaced by 21454749 800383 removed ...
Read full bulletin
611471 replaced by 611360 70376808 replaced by 21036050 21396642 replaced by 20967831
Electrical
1 bulletinAdded: Power cables for L.H.
Read full bulletin
side alternator & fan drive breaker box
Infotainment
1 bulletinMP-1000 MULTIMEDIA PLAYER INSTALLATION