Powered byNHTSA|EPA|Community Reports|Updated
HomeTSBsEntegra2020 Esteem

2020 Entegra Esteem TSBs

8 Technical Service Bulletins across 6 categories

Fuel System

3 bulletins
10232094

Standard Repair Procedure: 4K & 5.5K Generator Overheating Fuel Hose Protection.

Read full bulletin

Gas generators overheating while traveling. Adding a heatshield sleeve to the fuel line running from the rear axle to the generator fuel line connection.

10211966

JAYCO AND ENTEGRA COACH STORAGE TIPS.

Read full bulletin

INSTRUCTIONS FOR STORING JAYCO AND ENTEGRA COACH DIESEL PUSHERS.

10171768

Fuel Fill Bezel may be too low, restricting fuel flow into tank.

Read full bulletin

Raise 1 inch to ensure proper flow of fuel into tank. Stand

Lighting

1 bulletin
10211964

Process for cleaning soiled carpet.

Read full bulletin

CARPET CLEANING RECOMMENDATIONS

Other

1 bulletin
10195192

TSB Order form.

Engine

1 bulletin
10176436

Steps to find and correct air noise from or around the PTL entrance doors on motorhomes.

Electrical

1 bulletin
10171769

Medicine cabinet mounting screws missed the horizontal backers in wall.

Read full bulletin

Additional screws (4) are required to secure to the vertical wall backers.

Tires & Wheels

1 bulletin
10170782

Exterior Ladder was not manufactured per Jayco specifications, subsequently, the top and middle legs of the ladder do...

Read full bulletin

not align with support backers in the rear wall. Installation of additional legs ( total of 4) is required to ensure proper alignment with the rear wall backers